Laserfiche WebLink
<br /> <br />Mr. Steve O'Brian - 5 - August 29, 1985 <br /> Price Obrien Mix Farrel l Mix <br />S ep ties eP r Lb• (#/AC) Cost (#/AC) Cost <br /> <br />Intermediate Wheatgrass $1.17 (7) $8.19 (5) $5.85 <br />Pubescent Wheatgrass 1.49 (7) 10.43 (5) 7.45 <br />Western Wheatgrass 3.13 (5.5) 17.22 (5.5) 17.22 <br />Sand Bluestem 1.50 (5.5) 41.25 (5.5) 41.25 <br />Blue grama 4.38 (1) 4.38 1 4.38 <br />Sideoats grama 6.17 N/A 4 24.68 <br />Winter wheat .15 (1) .15 (1) .15 <br />Yellow sweetclover .40 (.5) .20 (.5) .20 <br />Alfalfa, Ranger 1.39 (.5) .70 (.5) .70 <br />TOTAL $82.52 $101.88 <br /> 83.00 102.00 <br />The following reflects the change in total Reclamation Costs: <br />Grass seed mix $83.00/AC X 50 AC = $4,150.00 <br />or $102.00/AC X 50 AC = $5,100.00 <br />Fertilizer $9.60/100#/AC X 50AC = $480.00 <br />8ackfill 30,000 cy @ $.38/cy~ $11,400.00 <br />Topsoil spreading <br />Seed mix drilling, fertilizing <br />and labor <br />Labor, Other <br />TOTAL <br />OR <br />38,000 cy @ $.59/cy = $22,420.00 <br />$90.00/AC X 50 AC = $4,500.00 <br />$104.00/AC X 50 AC = $5,200.00 <br />$48,150.00 $48,000.00 <br />$49,100.00 $49,000.00 <br />A financial warranty of $49,000.00 would require submittal. <br />However, estimating overburden requires evaluation prior to accepting the <br />reclamation cost estimate formulated. <br />OTHER <br />The 1985 annual fees and reports for the "Apache 9" (M-78-009) and "Apache 9A" <br />(M-78-010) operations were received by the Division on August 16, 1985. <br />Please clarify what is meant by "partial reclamation," and the location and <br />number of acres involved. <br />