Laserfiche WebLink
]ands within the State. <br />Pursuant to the cooperative agreement, federal coal lease holders in Colorado must submit pemiii <br />application packages to OSM and Colorado DMG for proposed minhng and reclamation operations <br />on federal lands in the State. <br />Colorado DMG reviews the packages to ensure that the permit application complies with the <br />permitting requirements and that the coal mining operation will meet the approved permanent <br />program's performance standards. OSM reviews the package to ensure that the coal mining <br />operation will meet the Federal Indian program performance standazds. If it does comply, Colorado <br />DMG issues the lessee a pertrut to conduct coal mirung operations on the federal lands portion of <br />the project area and OSM issues the lessee a permit to conduct coal mining operations on the Indian <br />lands portion of the project area. OSM, BLM, and other federal agencies review the permit <br />application package to ensure that it complies with the terms of the coal lease; the requirements of <br />the Mineral Leasing Act of 1920; (MLA); the National Environmental Policy Act of 1969; and other <br />federal laws and their attendant regulations. <br />OSM recommends approval, approval with conditions, or disapproval of the MLA mining plan to <br />the Assistant Secretary -Land and Minerals Management. Before the mining plan can be approved, <br />$LM and the surface-managing agency (if other than BLM) must concur with this recommendation. <br />Colorado DMG and OSM jointly enforce theperfomiance standards aria permitrequirements during <br />. the mine's operation and have joint authority in environmental emer:e;icies. OSM retains oversight <br />respoLVSibilityfornil enforcer:°at. BLM has authority in those emerg ;..cy situations where Colorado <br />DMG or OSM inspectors cannot act before environmental harm or ~_'<maae occurs. <br />Background <br />The Hay Gulch azea has historically been a coal producing azea Numerous abandoned mines exist <br />tluoughout the Hay Gulch drainage. However, except for the King Coal mine, there aze currently <br />no active coal mining operations in the Hay Gulch area or in La Plata County. <br />National King Coal currently has approximately 1209 acres underFederal lease, approximately 160 <br />acres under State lease, and approximately 541 acres under private lease which afford minable coal <br />reserves to the underground room and pillaz operation. All of these lease azeas are currently <br />permitted by Colorado DMG. The surface facilities at the mine aze located on approximately 11 <br />privately owned acres <br />The total remaining recoverable reserves in coalbed 1 as ofMay 26, 2000 contained on leased lands <br />controlled by National King Coal aze approximately 1,900,000 tons. <br />Production Data -The current operation mines entirely within the Upper Menefee coal seam just <br />SOUth Of the East A1kaL ~TraCL. -The CtL~rent nllne IS Capable Of prodilCing lip iv .7vt~l,vvti iv^uSiywr, <br />• and maximum annual federal production to date was 262,481 tons which occurred in 1998. The total <br />