Laserfiche WebLink
Amendment of M-84-041 Exhibit E page 4 <br />V RECLAMATION OF HAUL ROADS <br />The haul roads constructed along side hill slopes such as the one <br />from point (A) to point (B) and the onsite ways not retained for <br />future access, will be reclaimed by pulling as much of the fill <br />and wheel berm portion on the section as possible back up into the <br />cut portion of the section. While the surface form will not be <br />completely restored to its original configuration, the original <br />drainage pattern will be reestablished. Following this work, the <br />surface will be reseeded. <br />VI RECLAMATION OF SEDIMENTATION-CHECK PONDS <br />Reclamation of the sedimentation-check ponds will be accomplished <br />by filling the pond basins after vegetation has been established <br />on the other reclaimed areas. After the basins are filled, the <br />surface will be reseeded. <br />VII SEED MIXTURE FOR ALL SURFACE REVEGETATION <br />The following seed mix will be used for all surface reveg~tation: <br />i ~r <br />Species Seed rate <br />Indian ricegrass 33 1bs pls. "~ <br />Western wheatgrass 4 lbs pls. <br />Slender wheat grass ~4 lbs pls." <br />------------------------ ------------- <br />TOTAL SEED MIX ~r 11 LBS PURE LIVE SEED/ACRE <br />If the seed is placed by hand broadcasting, the above amount will <br />be doubled. ~ !' I , •~ • " <br />i <br />VIII USE OF LAND FOLLOWING RECLAMATION <br />The proposed use of the area following reclamation will be <br />wildlife habitat. It is anticipated that the reclaimed area will <br />provide better wildlife habitat than now exists because the <br />introduced vegetation planted on the relatively flat final surface <br />should produce a larger quantity of available feed. <br />~J <br />~ 7, ~ <br />~. <br /> <br />JEROME F. GAMBA & ASSOC. <br />CONSULTING ENGINEERS <br /> <br />