Laserfiche WebLink
CIRCES Cost Estimating Software <br />CATION sheet 1 of 2 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 61 State :Colorado Permit/job # : C1982-056 <br />Date :09/102007 County :Routt Abbreviation :none <br />User: JHB Site :FOidelCreekMine Filename:C056-6fE <br />Permit or other job action : Tr61 <br />Task description :Mobi-ize/demobi-ize <br />form <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 perday <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway track tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $16.63 $18.37 $22.33 <br /> Operating cosUhour : $44.38 $46.13 $50.07 <br /> Operator cosUhour : $27.66 $27.66 $27.66 <br /> HelpercosUhour: $0.00 $25.39 $25.39 <br /> Total Unit CosUhour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine WeighUunit Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT permit <br />Description (Tons) CosUhr/unit CosUhr/unit (No. units) CosUhr/fleet CosUhr/fleet CosUfleet <br />-Cat D9R - 9U (2005) 67.38 $65.09 $125.45 2 $381.07 $250.90 $0.00 <br />$381.07 I 8250.90 <br />t/'ro I ~~I?~~ g ra J7c~- <br />