Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul time (hours) = 0.45 <br />Return time (hours) = 0.45 <br />Loading time (hours) = 0.50 <br />Unloading time (hours) = 0.50 <br />Subtotals = 1.90 <br />0.45 Total non-roadable mob/demob cost' <br />0.45 'two round trips with haul dg <br />NA Total roadable mobldemob cost *' <br />NA "ona round trip, no haul rig <br />0.90 <br />Kiowa <br />18.0 miles <br />40.0 mph <br />$1,136.06 <br />$0.00 <br />............... .............. <br />JOB TIME AND COST Total job time : 3.80 hours <br />Total iob cost : 51.138 <br />EOUIPMENT HAUL DISTANCE and TIME <br />