My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-04-20_REVISION - M1985003
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985003
>
2007-04-20_REVISION - M1985003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:40 AM
Creation date
11/21/2007 11:15:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985003
IBM Index Class Name
Revision
Doc Date
4/20/2007
Doc Name
FW Increase
From
DRMS
To
Running Creek Ranch
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Date : 11-Apr-2007 Permit orjob no.: M-1985-003 Site : Freund Pit <br />User : DEG Abbreviation : none State : Colorado <br /> Filename : M003-000 County : Elbert <br /> Agency or organization name : DRMS <br /> Permit or job action :Surety Increase <br />,. <br />;: <br />TASK LIST (DIRECT COSTS) ,: , <br /> <br />FORM <br /> <br />FLEET <br /> <br />TASK <br /> <br />DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Backfill and Regrade dozer 1 14.9 $2,517 <br />002 -Grade and Replace Topsoil dozer 1 5.2 $887 <br />003 -Reveg revege 1 40.0 $5,064 <br />004 -MOb/Demob mobilize 1 3.8 $1,136 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> sueroTALS: 64.0 $9,604 <br /> 'inUudeS inFlation factor adjustment of : NA % TOTAL DIRECT COST `= $9,604 <br />INDIRECTCOSTS <br /> OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $194 <br /> Performance bond : 1.05 % of direct total = $101 <br /> Job superintendent : NA' NA NA total = NA <br /> Profit : 10.00 % o(direct total = $960 <br />• not required (or eqp. operator serves as super.) TOTAL O 8 P = $1, 255 <br />LEGAL-ENGINEERING-PROJECTMANAGEMENT• CONTRACT AMOUNT(direU+08P)= $10,859 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % o(cntr. NA total = $543 <br />CONTINGENCY- NA' NA total= NA <br />'contingencies accounted rw a( task level TOTAL INDIRECT COST = 52,298 <br />TOTAL BOND AMOUNT (direct+ indirect) = 511,902 <br />
The URL can be used to link to this page
Your browser does not support the video tag.