Laserfiche WebLink
iiiiiiiiiiiiiiuiii <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1317 Sherman SL, Room 215 <br />Denver, Colorado 90207 <br />Phone: 003) 966JSG7 <br />FAX: 1303)832-8106 <br />February 17, 1999 <br />Chuck Roberts <br />Department of Natural Resources <br />Division of Water Resources <br />li 13 Sherman S[ree[, Room 818 <br />Denver, CO 80203 <br />RE: Technical Revisions Nos. 6 and 7, Bowie No. 2 Mine. Bowie Resources Ltd.. <br />Technical Revision No. 30, Bowie No. I Mine, Bowie Resources Ltd. <br />Dear Mr. Roberts: <br />~~s <br />DIVISION OI`.; <br />MINERALS.~~ <br />& I <br />GEOLOGY <br />REC LAMATIOK` <br />MINING•SAFETYI <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Eaecmive Dueaor <br />Michael B. Long <br />Division Dvecmr <br />As a recipient of a completeness letter from this Division concerning the above-mentioned technical revisions, <br />[his letter is to inform you that there Itas been a change in the submittal of this information. For [he Bowie No. <br />2 Mine, Bowie Resources has withdrawn Technical Revision No. 6, which involved the installation of a <br />downhill conveyor, coal stockpile and truck loadout and the relocation of a sedimentation pond and Technical <br />Revision No. 7, which involved [he change in [he mine plan to go to longwall mining with an increase in <br />production from 2 million tons per year to 5 million tons per year. For the Bowie No. I Mine, Bowie <br />Resources has withdrawn Technical Revision No. 30, which concerned an increase in production at the railroad <br />loadout from 2 million tons per year to ~ million tons per year. <br />In place of the withdrawn Technical Revisions Nos. 6 and 7, Bowie Resources will resubmit the information <br />under one permit revision. Technical Revision No. 30 will be submitted at a later time, again, as a technical <br />revision. <br />For your information, Bowie Resources has submitted two additional technical revisions for the Bowie No. 2 <br />Mine. Technical Revision No. 8 requests a change in the mine plan to extract coal in the west section of their <br />present permit area. Technical Revision No. 9 is a request for an incidental boundary change to the permit area <br />in order to establish mine development in federal coal. Your organization will be receiving additional <br />information on these two new technical revisions when this Division finds the submittals to be complete. <br />[f you have any questions, please call me. <br />Sincerely, <br />9oseph J. Dt d sh <br />Environmental Protection Specialist <br />