Laserfiche WebLink
C-81-012: New Elk Midterm. Kent Gorham 13 <br />Fall seeding. Seeding specifications per species need to be followed at the time of planting <br />to assure revegetation success. Close consultation with the seed supplier, local NRCS, or <br />DMG personnel is recommended at the time of seeding. <br />Section VI <br />B ndin <br />The Division has completed a preliminary calculation of the reclamation cost liability as required <br />by Rule 3.02.2(4) and has included same with this midterm review. The estimated liability for <br />the New Elk Mine is now $2,709,561.00. You have the opportunity to an informal conference <br />on the adjustment, provided this conference is held within the response time frame of the mid-tens <br />review. The Division wiil notify you upon completion of the mid-term process should the required <br />bond need to be increased. <br />The Division currently holds bond #5700589 for $ 2,900,000.OOissued by Safeco Corporation for <br />reclamation at the New Elk Mine. <br />This concludes the initial phase of the mid-term review process. The Division would like <br />responses to this review by May 30, 1997. Your prompt attention to issues as oullined in this mid- <br />term review is appreciated. <br />-13- <br />