Laserfiche WebLink
I • <br />RECLANATION COST SUMMARY conL'd <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost ($) <br />__________________________________________________________I____________ <br />sheet 3 of 4 <br />Subtotal IH): <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No. Task Description ~ Cost ($) <br />SubC Otal lI): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task De sc rip Lion <br />________I__________________________________________ <br />1 ~ Replace Growth Medium in Mined Area <br />2 ~ Replace Growth Medium in Creosote Area <br />I 3 ~ Replace Growth Medium in Wash Pond Area <br />~i <br />i <br />Cost ($) <br />___I___________ <br />$7,902 <br />$2,60"1 <br />$9,899 <br />SubCOCdl IJ1: $14,853 <br />