My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91807
DRMS
>
Back File Migration
>
Revision
>
REV91807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:18 AM
Creation date
11/21/2007 11:14:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977170
IBM Index Class Name
Revision
Doc Date
9/4/1998
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Colorado Division of Minerals and Geology' <br />ESTIMATING FORM - MOTOR GRADER WORK <br />Task k: S Prep. by: JD Task File Name: M170-9 <br />____________ _________ ____"________ <br />Date: 09/09/98 Permit #:M-77-170 Mine: Butala Gravel Pit <br />____________ ______"__ _________________________________ <br />Permit Action: Phased Reclamation <br />Task Description: Smooth Grade Growth Medium <br />___""________________________________________________________ <br />HOURLY EQUIPMENT COST <br />_____________________ Basic Machine: CAT 120 SERIES G Horsepower: 125 <br />__________________ __________ <br />Attachment pl: N/A Shift Basis: 1/day <br />Attachment q2: N/A """ "" <br />Cost Breakdown: " """ "--"""""' <br />Ownership cost/hr = $11.57 <br />Operating fi overhaul cost/hr -grader = $17.03 <br />-ripper = $0.00 <br />Operator cos[/hr $23.30 <br />Total eqp[. unit cost/hr = $51.91 <br />MATERIAL QUANTITIES <br />Total area co be graded: 24.60 acres <br />Source of quantity take-off: Calculation <br />Utilization k IDQI 9bQ1 <br />N/A <br />100 <br />N/A <br />N/A <br />Total fleet cost/h r: $51.91 <br />HOURLY PRODUCTION <br />=Selected grading actrvi [y/work level: Medium grading only <br />Unadjusted hourly unit production: 1.49 acres/hr ICat Handbook t86) <br />Job Condition Correction Factors: <br />Avg. site altitude 7170 f[. <br />Altitude adjustment: 1.00 (Cat Handbook pDm) <br />Job eff is rency.... 0.83 (lsh/day e~6) <br />NeC Job Correction: 0.83 <br />Adjusted hourly unit production: 1.29 acres/hr <br />Adj used hourly Eleet production: 1.24 acres/hr <br />JOB COST <br />= Fleet size <br />____ 1 Grader(s) <br />___ Total Job Time: 19.89 Hours <br />___________ <br />Unit Cos[ $91. <br />____ 979 /acre <br />___ TOCal Job GOSC: $1,072.55 <br />___________ <br />
The URL can be used to link to this page
Your browser does not support the video tag.