Laserfiche WebLink
i <br />In summary, SEDCAD models do not indicate that, <br />theoretically, there is a need for a rock-lined channel in the West <br />Streeter drainage. in this particular instance, Colowyo intends to <br />construct a rock drainage anyway, and will utilize the channel <br />design for a 100 year/24 hour storm event as a general guide to <br />channel construction. <br />Lastly, as you will recall, with respect to item #1 of <br />the Division's August 4, 1993 correspondence, Colowyo submitted a <br />response on August 4, 1993. If you have any additional concerns <br />regarding this T.R. please contact me. <br />Sincerely, <br />~ ~. ~~ <br />~ames A. Kiger <br />Sr. Environmental <br />btb <br />Attachment <br />xc: R. G. Atkinson <br />BLM - LSRA <br />BLM - CDO <br />OSM - WTC <br />OSM - AFO <br />Moffat County <br />Central Files <br />(w/o attachments) <br />Clerk & Recorder <br />Specialist <br />