Laserfiche WebLink
BOWIE RESOURCES -BOWIE NO. 1 MINE The Subsidence Monitoring Point 99 is located 1,490 feet from recent mining. This point is not within <br />SUBSIDENCE MONITORING DATA TR-39 the angle of draw of the Bowie No. 1 Mine workings and was most recently approached by workings <br />described as Entries in 1995, more than 6 years ago. <br />STATION: 99 <br />Roof Bolt <br />DATE NORTHING FASTING ELEVATION -DOWN/+UP <br />7/16/1992 20479.40 -156.41 7921.90 0.00 <br />1/71/1994 20478.06 -154.61 7920.94 -0.96 <br />10/10!1994 20479.96 -157.48 7920.95 0.01 <br />6/5/1995 20480.99 -157.60 7921.89 0.94 <br />6/17/1996 20481.40 -157.36 7920.34 -1.55 <br />11/10/1997 20481.43 -157.36 7921.90 1.56 <br />6/21/1999 20481.26 -157.13 7921.87 -0.03 <br />6/24/2000 20481.25 -157.31 7921.93 0.06 <br />MAXIMUM 20481.43 -154.61 7921.93 1.56 <br />MINIMUM 20478.06 -157.60 7920.34 -1.55 <br />RANGE 3.37 2.99 1.59 <br />Page 9 <br />