Laserfiche WebLink
BOWIE RESOURCES -BOWIE NO. 1 MINE <br />SUBSIDENCE MONITORING DATA TR-39 <br />STATION: 82 #5 Steel Rod <br />The Subsidence Monitoring Point 82 is located 535 feet from recent mining. This point is within the <br />angle of draw of the Bowie No. 1 Mine workings and was most recently affected by workings <br />described as Entries in 1995, more than 6 years ago. <br />DATE NORTHING FASTING ELEVATION -DOWN/+UP <br />6/17/1996 22647 .00 3430. 52 8651. 33 0.00 <br />11/10/1997 22646 .75 3430. 60 8651. 32 -0.01 <br />7/10/1998 22646 .61 3431. 05 8651. 03 -0.29 <br />6/17/1999 22646 .51 3430. 95 8650. 72 -0.31 <br />6/24/2000 22646 .56 3430. 99 8650. 93 0.21 <br />MAXIMUM 22647.00 3431.05 8651.33 0.21 <br />MINIMUM 22646.51 3430.52 8650.72 -0.31 <br />RANGE 0.49 0.53 0.61 <br />Page 6 <br />