Laserfiche WebLink
Stipulation No. 19 <br />WITHIN 30 DAYS, EFCI WILL RE-EVALUATE THE ENGINEERED DESIGNS FOR POND 5 <br />TO ACCOMMODATE SEDIMENT GENERATION FROM THE ENTIRE WATERSHED. IN <br />ADDITION, MAP 21 WILL 8E MODIFIED TO REFLECT HYDRAULICS ASSOCIATED WITH <br />THE REDUCED WATERSHED. <br />