Laserfiche WebLink
Page 2 of 2 <br />SL-02 Industrial Bond <br />Release <br />Task Comments Cost <br />4 load and haul bed coal 7551 <br />8 rip JC TS base 3333 <br />13 grade JC TS area 504 <br />20 regrade ditches at LO 3867 <br />37 replace TS to service area 359 <br />58 TS to LO (TR-14 got it all) 0 <br /> hydro seed steep <br />70 embankments 10582 <br />71 broadcast JC TS piles 9017 <br /> Seed LO(TR-14 got most of <br />72 it) 751 <br />82 clean LO sed pond 8040 <br />101 regrade LO 600 <br />102 replace TS to berm 2196 <br />TOTAL 48800 <br />I have asked Lorencito to reclaim the sediment pond at the loadout. I have also asked why <br />they included $25, 974.00 in their request. And finally, I need to verify that they hydro-seeded <br />the Jeff Canyon steep road embankment. <br />[end Stark memo] <br />Ron if we can figure out the acreage and dollar amounts and get the field work completed, we should be able to <br />wrap this up once Jim Stark reviews and recalculates the cost estimate. It may take him a couple weeks given his <br />work schedule. His efforts will also aid in completing the Lorencito Renewal RN-02. Thanks for you assistance. <br />Kent Gorham <br />Division of Reclamation, Mining, and Safety <br />Colorado Department of Natural Resources <br />303-866-4931 <br />11/7/2007 <br />