Laserfiche WebLink
<br />_3_ <br />10. Primary future Cropland(CR) Pastureland(PL> General Agriculture(GA) <br /> _ <br />(Post-mining) RangelandCRL) _ <br />_ Forestry(fR) _ <br />_ Wildllfe Habltat(WL) <br /> land use XX Residenttal<RS) Recreation(RC) IndustriallCommercial(IC) <br /> (check one): _ Developed Water Resources(WR) _ Solid Naste Disposal(WD) <br />11. Primary resent XX Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> land use Rangeland<RL) _ <br />_ <br />Forestry(FR) _ Wildllfe Habitat(WL) <br /> _ <br />(check one): Residential(RS) _ <br />Recreation(RC) _ Industrial/Commercial(IC) <br /> _ Developed Water Resources(WR) <br />12. Method of Mining: _ Quarry (QR) _ Solution (SO) <br /> 12a. Other: Briefl y explain mining method (e.g. Placer, truck/shovel>. <br /> _ Excavation by front-end lo adP rc anri crra arc <br />13. On Site Processing: Solut ion (SO) Chemic al <CH) _ Thermal (TH) <br /> _ Heap Leach (HL) _ Vat Le ach (VL) <br />. 14. Application Fee: <br />The application fee for Quarry mining is ;2,325. <br />The application fee for Solution mining or any Chemical or Thermal Processing <br />is ;3,100. <br />If none of these methods or processes are to be included in the operation then the <br />application fee 1s ;1,875. <br />The application fee for conversion to a 112 permit is ;1,500. <br />112 Amendment application fee is 51,550. <br />An applicant rill not be issued a reclamation permit until notified by the Division that <br />this application and the required performance and financial rarranties have been <br />approved. Alternatively, an automatic approval will bccur where the Division fails to <br />notify the applicant/operator that the application has been dented. The final agency <br />action must be made within 120 calendar days from the date the application was <br />submitted. However, the performance and financial warranties must be approved by the <br />Division or Board before a permit will be issued even if you receive an automatic <br />approval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT IS ISSUED (Rule 7.2(2>). <br />It shall be a provision of this permit that the operations will be conducted in <br />accordance with the terms and conditions listed 1n your application, as veil as with the <br />provisions of the Act and the Mineral, Rules and Regulations in effect at the time the <br />permit is issued. <br />