Laserfiche WebLink
<br />8. RECLAMATION. It is understood that Lessee has the obligation <br />to develop a reclamation plan for the demised premises, which <br />reclamation plan shall be submitted to and approved by Lessor prior <br />to Les:~ee securing the necessary mining permit from any regulatory <br />authority. The mining plan and the reclamation plan will be <br />developed in a manner so as to reasonably comply with the Lessor's <br />desired end-use of the property. Any plan of reclamation shall <br />includE: the following: Lessee shall make separate stockpiles of <br />topsoi].and waste substances; on completion of removal of materials <br />from pits dug on these premises, Lessee agrees to place any unused <br />waste substances and materials used for roadways back into the pits <br />with topsoil placed on top and to back-slope such pits, unless the <br />pits ax•e to be used for ponds; Lessee agrees to plow, level and <br />~:~.vs:~mu.,.us.e.~ <br />