Laserfiche WebLink
• • <br />C & M !iand and Gravel Company <br />Distel Farm Resource <br />Weld County, Colorado <br />MINOR DISTURBANCE <br />RECLAMATION COSTS <br />ITEM UNIT TOTAL <br />NO. ITEM UNIT QUANTITY PRICE PRICE <br />1 Backfil] Shoreline <br /> Overburden C.Y. 0 $1.50 $0.00 <br />2 B,ackfill Shoreline <br /> Topsoil C.Y. 0 $1.50 $0.00 <br />3 Redistribute Topsoil <br /> to Strip C.Y. 0 $1.50 $0.00 <br />4 Sr;arify Compacted <br /> Areas ACRE 0.0 $725.00 $0.00 <br />5 Seed, Fertilize, <br /> Mulch ACRE 3.4 $500.00 $1700.00 <br />TOTAL ............... $1700.00 <br />NOTES/L)ESCRIPTIONS: <br />Seed, Fertilize, Mulch Reseed 3.4 Acre unacceptable germination (10%) <br />SUMMARY OF RECLAMATION COSTS <br />Major Disturbance $ 49,875.50 <br />Moderate Disturbance $ 27,562.50 <br />Minor Disturbance $ 1.700.00 <br />$ 79,138.00 <br />Contractor Mob/Demob Cost $ 2,000.00 <br />Breaching existing lake liner $ 2.000.00 <br /> $ 83,138.00 <br />Administrative Cost (21.6%) $ 17,958.00 <br />Total Recaamation Cost $101,096.00 <br />Proposed Reclamation Bond $101,100.00 <br />Bonded Cost Per Acre (50.8ac) $ 1,990.16 <br />C & M Companies wishes to bond the additional acres addressed in this amendment application <br />separately from the original permit area. The properties have different owners and C & M has <br />negotiated separate leases with each owner, therefore, this reclamation bond calculation only <br />addresses ¢he amendment acreage and would be additive to the existing bond. <br />17 <br />