Laserfiche WebLink
• TABLE A (Continued) . <br />HYCfZOLOGIC hgNITORING SITES <br />4WTER LEVEL MFASUREI~ENIS <br />SITE hUNIIORING FREQLfNCI' CQMEMS <br />Water Level Only <br />Foidel Creek <br />D / 14 Monthly (1), (z) & (3) <br />p /304 hbnthly (1) & (2) <br />Fish Creek <br />D / 16 Nbnthly (1), (z) & (3) <br />~ ~ w, 'SS ~'•~ hbnthly (During Irrigation) (1)(4) <br />~ /30~ hbnthly (1) ~ (z) <br />~m ~~ hbnthlY (1) (z) & (3) <br />Notes: <br />(1) Included with TvRntyrtrile Coal CarQarly's hydrologic imnitoring program. If site is <br />renoved frcm TCC's program and continued monitoring is required, CYCC will monitor <br />site. <br />(z) Monthly measurements for water level collected during ice free months: late March <br />or early April through Septer6er. <br />(3) These sites are also caipcxxients of wrface stream flav monitoring program. <br />(4) First headgate of irrigation ditch downstream of mine discharge. Monitoring to <br />begin arks Fish Creek Dewatering Facility is functioning. <br />NR 90-58 Ex. 8-7 Revised 09/07/90 <br />