Laserfiche WebLink
~- <br />1. when necessary, topsoil stockpiles will be seeded in <br />accordance to Display E information from the NRCS <br />2. 2,3,4,5,6,7,8 will be followed as needed <br />x. 3.1.10 <br />1. 1,2,3,4,5,6,7,8,9 will be followed as needed with revegauon <br />done according the Display E information from the NRCS <br />xi. 3.1.11 no structures are in the affected azea. An existing cemetery <br />is within the boundary, but not in the affected area see map <br />Display C-d <br />xii. 3.1.12 signs and markers will be posted as required <br />d. see Display E information from the NRCS and section 6.4.4 <br />e. see section 6.4.4 <br />f. <br />i. final grading -slopes will be no steeper than 3:1 <br />ii. seeding -see Display E information from the NRCS <br />iii. fertilization - no fertilization will be used <br />iv. revegetation -none will be done except seeding as described in <br />Display E information from the NRCS <br />v. topsoiling -depth range should be between 1" to 12" <br />6.4.6 EXHIBIT F -Reclamation Plan Man <br />a. see maps Display F (contour map) and Display F-a (post mining contours). To <br />establish contours prior to excavation isn't feasible at this site since the deepest <br />the excavation will extend to is appr. 15'. All fmished slopes will be no steeper <br />than 3:1 <br />b, fmal land use is rangeland <br />6.4.7 EXHIBIT G -Water Information <br />1. this operation is not expected to directly effect surface or groundwater systems <br />6.4.8 EXHHtIT H -Wildlife information <br />1. <br />a. same as with the original pit <br />b. same as with the original pit <br />c. same as with the original pit <br />d. same as with the original pit <br />6.4.9 EXHIBIT I -Soils Information <br />1. see section 6.4.3 <br />6.4.10 EXHHIIT J - Veeetstion Information <br />1. see Display E information from the NRCS <br />2, see Display E information from the NRCS <br />6.4.11 EXHIBIT L -Climate <br />1. see Display E information from the NRCS; <br />