Laserfiche WebLink
Task <br />No.~ Description Original <br />Es[imateZ SL-O1 <br />Estimate' Renewal 3 <br />Estimate° 1999 <br />Midterm <br />Review <br />Es[ima[e4 <br /> S[owin refuse in mine $0 $0 $0 <br /> Re radio $71,000 $10,806- $0 $0 <br />1-5 Earthwork, items A-H $7,576 $0 <br />6-9 Berm, ditch and sediment <br />and re radio ,item I~ $2,200 $2,200 $12,667 $6,020 <br />10, 11 Deleted <br />12-22 To soil distribution, item J $46,000 $46,000 $20,354 $3,137 <br />23-27 Revegetation (and <br />miscellaneous), items L & M~ $36,500 $36,500 $57,465 $50,089 <br /> O eratin (indirect) costs $17,000 $17,000 $27,785 $20,028 <br /> <br />Total $276,200 $112,506 $125,847 $79,274 <br /> <br /> Bond Covera e $288,000 $126,006 $126,006 $126,006 <br />~ Task numbers and designations are those assigned in the Division of Minerals and Geology cost <br />estimate for Permit Renewal 3. <br />ZTable 4.4-4, page 4-67 <br />s SL-O1, October 1995 <br />° Prepared by the Division of Minerals and Geology <br />s Retention of Phase I bond coverage for items determined not complete during the Phase I bond <br />release. <br />e Task19 <br />~ The amount necessary for the Division to complete the approved reclamation plan [Rule <br />3.03.1(3)(d)]. The required minimum bond coverage after future Phase II Bond Release and until <br />Phase III Bond Release is $43,200 [Rule 3.03.1(2)(b), 100%-85%) x $288,000][an amount <br />greater than the $10,000 minimum Rule 3.03.1(4) requirement pending Phase III Bond Release]. <br />1 Attachment: Colorado Division of Minerals and Geology Cost Estimate for Remaining <br />Reclamation Work (Summary Form) <br />Files: C-84-065 Midterm Review Findings <br />C:\W PDOCS\Coal Ridge\midtermreview99.065.doc <br />