Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 3 of L <br />H. EARTHWORK -STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (S) <br />NONE ~ <br />~ ~ <br />Subtotal (H): <br />i. EARTHWORK -DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Oescription ~ Cost (5) <br />6 ~ Backfilt Sediment Pond ~ 54,231 <br />7 ~ Recut Ditch Along Remaining Haul Road ~ 5133 <br />8 ~ Grsde Remaining Ditcfies ~ 51,567 <br />9 ~ Backfilt Berm Associated with SAE #2 ~ 589 <br />~ ~ <br />•:. <br />,, ,. <br />' I .. . <br />Subtotal ([): 56,020 <br />=__- ==os=== <br />J. EARTHWORK - TOPSOILLSUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (5) <br />19 ~ Redistribute Topsoil onto Regraded Pond ~ 53,137 <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />Subtotal (J): f3,13T <br />