My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91512
DRMS
>
Back File Migration
>
Revision
>
REV91512
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:02 AM
Creation date
11/21/2007 11:11:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981277
IBM Index Class Name
Revision
Doc Date
9/22/1994
Doc Name
LOUKONEN QUARRIES DESCRIPTION
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Mi rera la and Geology <br />EST IMAT IKG FORM - BULLDOZER WRK <br />Task N: S Prep. by: YLY Task File Mama: M277-5 <br />Date: 09/22/94 Permit >Y: M-81-277 Mine⢠Loukanen Querri es <br />Permi[ Action: AM-001 <br />Task Deseri ption: Regrade Isle Quarry waste rock <br />Hg1RLY EQUIPMENT LOST <br />_________ ___________ Basic Machine: Cat D6N Horsepower: 165 <br /> Blade Type: Seni-Universal -- <br /> Attachment ~Y1: RODS Lab Shift Basis: 1/day <br /> Attachment A2: N/A ---------- <br />Cost Breakdown: <br />------------- Utilizer ion X (code bSli) <br />Ownership cost/hr = 522.25 N/A <br />Operating 8 overhaul cost/hr- dozer = 522.63 100 <br /> -ripper = 10.00 N/A <br />Operator Lost/hr = 521.58 N/A <br />Total egpt. unit Lost/hr = f66.46 Total fleet cost/h r: f66.46 <br />MATERIAL QUANTITIES <br />___________________ <br />___________________ <br />Initial <br />Swell <br />Loose <br />Volume: 500.0 BCY Factor: 1.330 Volume: 665.0 LLY <br />Source of quantity ta ke-off: Exhibit L <br />Source of est. swell factor: ne <br /> <br />XOURLY PRODUCTION ------- -------------------------- ------------------ <br />__________ ______ Job Condition Correction Factors <br />Avg. push distance: 70 ft. -------------------- ------ <br />_ _____-_- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 0.90 (Cat tbL) <br />dozer production: 449 LCT/hr Dozing method..... 1.00 (gen.) <br />- ------ Visibility........ 1.00 (avg.) <br />Materiel consistency: Job efficiency.... 0.83 (1sh/day) <br />Caipected fill or embankment Transmission type. 1.00 ( PS > <br />-""----_"'___'--- --"-"-------- Grade adjustnent .. : 0.90 (tat tbl) <br />Avg. push gradient: 5.00 X (pos) Altitude adj. .... 1.00 (Lac tbl) <br /> Meteri et weight... 0.79 (Cat tbl) <br />Avg. Bite altitude: 6000 ft. Blade type........ 1.00 (S or U) <br />Materiel weight 2900.00 lb/LCY Net Job Correction 0.40 <br />Mat. Descr.: - -------- --- ------- <br />Decanposed rock - 50X Rock, 50X Earth Adjusted Unit Prod.: 180.28 LCY/hr <br /> Adjus ted Fleet Production: 180.28 LLY/hr <br />JOB COST __-- .,______ <br />Fleet size 1 Dozer(a) Total Job Tine: 3.69 Nouns <br />Unit Cost 50.369 /LCY Total Job Cost: 5245.14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.