Laserfiche WebLink
Colorado Division of Minerals erd Geology <br />EST MUTING FORM - BULLD02ER YORK <br />Task M: 3 Prep, by: YLY Task File Marne: M277-3 <br />Date:-~OV/22(94 Permit R:M-81-277 Mine: Loukonen Ouarriea----- <br />~i Permit Action: AM-007 <br />Task Description: Regrade Sunni Quarry waste rock <br />' HOURLY EQUIPMENT CAST <br />____________________= Besie Machine: Cat D6H Horsepower: 165 <br />Blade Type: Semi-Universal -------- <br />Attechment M1: ROPS Cab Shift Basis: 7/day <br />Attachment i@: N/A -- <br />Coat Breakdown: <br />i -------------- Utilization X (code bS0) <br />' Ownership Lost/hr = (22.25 N/A <br />Operating 8 overhaul cost/hr- dozer = 522.63 100 <br />-ripper = 50.00 N/A <br />Operator cost/hr = (27.58 N/A <br />Total egpt. unit costlhr = 566.46 Total fleet Lost/hr: 566.46 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 1,000.0 BCY Factor: 7.430 Volume: 7,430.0 LLY <br />Source of quantity take-off: Exhibit L <br />Source of est. swell factor: na <br />HOURLY PRODUCTION ' <br />________________= Job Condition Correction Factors <br />Avg. push distance: 75 ft. ------------------- ---------- <br /> Operetor.......... 0.75 (avg.) <br />Unadjusted hourly Met. consistency.. 0.90 (Let tbl) <br />dozer production: 437 LCY/hr Dozing method..... 7.00 (gen.) <br />--- Visibility........ 1.00 (avg.) <br />Materiel consistency: Job efficiency.... 0.83 (1sh/day) <br />Crnpected fill or embankment Transmission type. 7.00 ( PS ) <br />------------------- - ------- Grade adjustment.. 0.67 (Cat tbl) <br />Avg. push gradient: 75.00 X (pos) Altitude adj. .... 7.00 (Cat tbL) <br />--------- Materiel weight... 0.70 (Cat tbl) <br />Avg. site altitude: 6000 ft. Blade type........ 1.00 (S or U) <br />Materiel weight 3300.00 lb/LCY Net Job Correction 0.26 <br />Ma[. Descr.: --------- - --------- <br />Decomposed rock - 75X Rock, 25X Earth Adjusted Unit Prod.: 772.28 LCY/hr <br /> Adjus ted Fleet Production: 772.28 LLY/hr <br />J08 COST - --- <br />Fleet size 7 Dozers) Total Jab Time: 72.74 Hours <br />Unit Cost 50.592 lLCY Total Job Cost: 5846.42 <br />