Laserfiche WebLink
,. _.S <br />8. The submittal indicates that the contributing watershed has been planted to a cover crop. <br />How long will the area be in a cover crop? <br />9. Please provide the supporting documentation, from Amoco, used to arrive at the <br />maximum volume of potential oil spillage. <br />10. Included in the submittal is a proposal to maintain the livestock pond as a permanent <br />impoundment. Please provide all documentation necessary to demonstrate compliance <br />with 4.05.9(1). <br />11. Given the potential for serious environmental damage in the event of a pipeline rupture, <br />the Division believes it would be prudent for CEC to conduct a visual examination of the <br />exposed pipeline sections on a daily basis. Please include a commitment to this effect <br />in the revised permit application package. <br />12. Please provide a timeframe for reclamation of all temporary structures associated with <br />the subsidence mitigation plan for the pipeline. <br />If you or the operator have any questions or need clarification of these concerns, let me know. <br />M:\COAL\SLB\0624946. W P <br />Tony Waldron 2 ~ June 24, 1994 <br />