My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91452
DRMS
>
Back File Migration
>
Revision
>
REV91452
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:59 AM
Creation date
11/21/2007 11:11:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976059
IBM Index Class Name
Revision
Doc Name
EXHIBIT A AMENDMENT I MARCH 1992 LOCATION CORTEZ QUARRY-NIELSONS AMENDMENTS OF MARCH 1992 IN
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />EXFIIBTf E <br />AMENDMENT i <br />(March 1992) <br />RECLAMATION PLAN <br />CORTEZ QDAARY - NIELSONS, INC. <br />(Astendaeats of March 1992 <br />is Boldlaae) <br />Reclamation of the Cortez Quasrp is not expected to <br />Delete <br />begin for quite some time. As the pit will be expanded both <br />horizontally and vertically, reclamation cannot begin until <br />the floor of the pit is to its lowest expected level. This <br />will be approximately forty (40) feet below present grade. <br />llorked-out lilt surfaoes and quarry !loot areas are utilised <br />!or on-goinq proaessinq and stockpiling aotivities. <br />Presently about si: and one-tilth notes are disturbed by <br />aiaiaq so far. <br />Topsoiled areas will be fertilized with a commercial <br />fertilizer based upon a soils test at the time of reclama- <br />tion, and will include at least fifty (50) pounds of avail- <br />able nitrogen per acre. <br />Realamation of the affected area is nor planned to be <br />••industrial,•• that is, a ^aiateaaace and storage yard site <br />!or the oa-goinq conatruation - related support aotivities <br />o! the perstitted operator and land orner, ltielsons, Iao. <br />The corked-out quarry !loot rill be graded as satooth and <br />llat as possible, utilising any sandstone ••produat•• reuin- <br />iaq to assist is the leveling process. Drainage is acoo~o- <br />dated by rapid percolation o! surface aoisture inte the <br />porous sandstone gravels. Minor amounts of surtaoe soil <br />that xere stockpiled at the north boundary during stripping <br />operations of the ~iae shall be left is a neatly graded and <br />revegetated flat bet: having sideslopss of loss than 3:1. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.