Laserfiche WebLink
~• •• <br />(MINING PLAN Continued) <br />-2- <br />As material is mined, it is fed to a crusher for <br />processing to the desired size and then stockpiled in the <br />pit area for use as needed. The crusher and stockpile area <br />will move throughout the pit as required to remain adjacent <br />to the excavation operation. Handling and stockpiling will <br />be done with a combination of dozers, front-end loaders, <br />trucks and conveyors. <br />The material is removed from the pit area using trucks <br />and a loader. Access to the county road is an existing <br />paved road belonging to Nielsons and is part of their office <br />- shop complex just south of the pit area. The scales shown <br />on the general map are used in this removal process and are <br />the only piece of equipment which is constantly at the site. <br />Szplosives and aoastruation equipment and aaterial• both !or <br />the cer~itted aiaiaa operation and for other aoastruotioa <br />endeavors of th• operator/land owner, Nielsons, ino., will <br />be inteaitteatlp stored within the permitted area. <br />At present market demands for this product, the mining <br />at this quarry is expected to continue for at least the next <br />twenty years. <br />