Laserfiche WebLink
(Not for DP Entry) Includes PR-07, PR-08, and TR-90 <br /> Perntitted Actual Proposed <br />8. Minerals ownership: <br />Indicate currently permitted acreage for each <br />Federal: acres 8,044.6 8.044.6 N/A <br />State: acres N/A N/A N/A <br />Private: acres 1,135 1,135 N/A <br />Indian: acres N/A N/A N/A <br />9. Surface ownership: <br />Indicate currently permitted acreage for each <br />Federal: acres 6,083 6,083 N/A <br />State: acres N/A N/A N/A <br />Private: acres 3,500 3,500 N/A <br />Indian: acres N/A N/A N/A <br />10. Affected area (in acres) 7,972 7.972 N/A <br />I I. Disturbed area (in acres) 21 1.30 21 1.30 N/A <br />12. Acreage of area reclaimed in previous permit <br />Tertn <br />A. Backfilled and graded N/A N/A N/A <br />B. Retopsoiled N/A N/A N/A <br />C. Reseeded N/A N/A N/A <br />13. Acreage for which bond has been released N/A N/A N/A <br />A. 60 percent N/A N/A N/A <br />B. 85 percent N/A N/A N/A <br />C. 100 percent N/A N/A N/A <br />l4. Renewal Term Requested (Years) N/A N/A 5 <br />Note: /jthe application contains proposed (new) acreage, Then a permit revision application form must also <br />be completed jor those acreages. <br />I5. Type of Mine (Check one): X Underground _ Surface <br />_ Combined Surface and Underground <br />Loadout Other <br />16. Current Permit Status (Check one): X Active _ Temporary Cessation <br />Permanent Cessation (Reclamation Only) _ Suspended <br />17. Current Estimated Life of Mine (in years): 2 5 <br />