Laserfiche WebLink
III Iillllllilllllll <br />• <br /> <br />TR 95-40 DEVELOPMENT DRILLING PROGRAM <br />RECLAMATION BOND ESTIMATE <br />Drill Holes <br />Assume: 1 hole at total depth of 2000 feet <br />plus 1 twin hole <br />6 1 /4 inch diameter hole <br />15.1 CY per hole <br />Plugging hole <br />Rig Time <br />10 hours/hole x $125/hour x 2 holes = $2500 <br />Water Truck <br />10 hours/hole x $38/hour x 2 holes = $ 760 <br />Flatbed Pipe Truck <br />10 hours/hole x $36/hour x 2 holes = $ 720 <br />Pickup Truck <br />10 hours/hole x 30/hour x 2 holes = $ 600 <br />Slurry <br />15.1 CY/hole x $62/CY x 2 holes = $187? <br />Regrading site / backfill pits <br />(1 extra site for twinning) <br />Dozer <br />• <br />4 hours/hole x $50/hr x 2 holes <br />Regrading roads - No road construction planned <br />Revegetation <br />0.1 acre x $300/acre <br />Mob/demob <br />Subtotal <br />25% Admin <br />TOTAL <br />SAY <br />_ $ 500 <br />_ $ 30 <br />_ $1500 <br />_ $8483 <br />_ $2121 <br />_ $10604 <br />$11000 <br />