My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91362
DRMS
>
Back File Migration
>
Revision
>
REV91362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:55 AM
Creation date
11/21/2007 11:10:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
7/2/1993
Doc Name
WEST ELK MINE PERMIT C-80-007 RESPONSE TO SECOND ADEQUACY REVIEW TR 63 LOWER REFUSE PILE RECONFIGUR
From
MOUNTAIN COAL CO
To
MLR
Type & Sequence
TR63
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 3 <br />C.Johns~n <br />07/01 /93 <br />Vy <br />~\~G,` \~ <br />J10 Except for the south ditch (D6~) the interim sediment ditch locations <br />d ~~ shown on Figure 2.0 are the same as the final locations. The south ditch <br />/ will not be established until the pile reaches the elevation of the main <br />haul road. Until that time, as discussed in the paragraph added to <br />section 6.1 (see #9 above), MCC has committed to positive drainage on <br />the south side of the lower refuse pile in the interim. <br />7.0 Roads <br />J,. A reference to figure LWP-015A has been added to paragraph #1 in <br />~,v Section 7.1 and the table of contents of revised Exhibit 51. <br />J 2. The correct figure LWP-019 is the Rocky Mountain Geotechnical sheet <br />p ~/i entitled "Plan and Profile Sheet and Cross Sections, Temporary <br />Realignment of Sylvester Gulch Road". The other figure shows the minor <br />relocation of the refuse pile.access road after the office trailers were <br />moved from that site west.of the refuse pile and south of the old main <br />gate and the CT8 E lab buildings. This figure is not applicable and <br />should not be included in revised Exhibit 51. <br />~~. The reference to Table 11 has been changed to Table 9. <br />0~~4. A statement of Mountain Coal Company's ownership of the Tony Bear <br />pipeline has been added to section 7.3. <br />8.0 Monitorino <br />1. Figure LWP-020 has been added and depicts the locations of the survey <br />monuments. ~1I~,tyf ShoUicJ q0 i/~ aBv~liE~~GCu~ In ~~blC 0-F <br />lv~i ~ Pr~~,S cJ <br />9.0 Reclamation <br />1. A statement regarding berms and barriers has been added to the end of <br />Section 9 in revised Exhibit 51. ~J Say Sid EL~'~e+~ (; "~{ ~~,~~+ t ~P o~ tZti <br />P~~L d~~l Jae blaclud 1~1/ /t:~~cula. Etia F~ic uPoK row,Pl~{-rati efire%~atian <br />" 2: Mountain Coal Company believes that the bond should not be adjusted <br />for four feet of cover as the refuse pile vegetative success is visibly <br />evident. Only a small part of the North face has been revegetated for <br />more than two years, but all of the seeding and subsequent plant growth <br />~k-rrL53 ap/~roVe~ ~~~-~aM~- fi~~~ NEE ~~ ~o~~. t~>,~for,e; <br />will 6o~A ~nr l~'~LN" n ~ IOVGi-, <br />pF~-~d~~o~+s b~ pldr,~r~ ~ ~ 6e /~~, or roc ~ ~vrvi~r dG/OfS dCG~ SS ~>oi.- i S <br />
The URL can be used to link to this page
Your browser does not support the video tag.