Laserfiche WebLink
<br />-3- <br /> <br />at ror ntry <br /> Permitted Actuat Pro90sed <br />7. Minera] aKner:hip: <br />(indicate currently <br />pernitted acre far each) <br />Federal ac., 863.49 863.49 863.49 <br />State ac., 0 D 0 <br />Private ec., 185.38 185.38 185.38 <br />Indian "-ac. 4 0 0 <br />8. Surface wnership: <br />(indicate currently <br />pernitted acreage Por <br />each) <br />Federal ac., 863.49 863.A9 863.49 <br />State ac., 0 0 D <br />Private ac., <br />'- 185.38 185.38 185.38 <br />Indian <br />ac. 0 0 0 <br />9. Affetted area (in acres) 546 548 548 <br />10. 015turbed area (in acres) 122 5.6 122 <br />11. Acreage of area reclaimed <br />in previous permit term <br />a) Dackfilled and graded n/a D n/a <br />b) retopsoiled n/a D n/a <br />c) reseeded n/a 0 n/a <br />12. Acreece Par which bond <br />has been relessed <br />a) 60 percent n/a 0 n/a <br />h1 85 percent n!a 0 n/n <br />c) 100 percent n/a 4 n/a <br />13. Renexal Tenn Requested <br />(Tears) n!a n/a 5 <br />(Nate: IP the application contai ns proposed (nex ) acreage, then a permit I <br />I revision aoplicatton farm must also be co mele~xd far those acreages. I <br />la. Type of Mine (check one): ~ Underground, _ Surface, <br />Camoined Surface and underground, _ Load-Out, ~ Other: <br />1:. Current Permit Status (check one): Active, Taoporary Cessation, <br />Permanent Cessation (reclamatioo oon~y), ~spended <br />16. Current Estimated Life of Mine in years: ~~ <br />