Laserfiche WebLink
<br />,. <br />structure and removal of the mine office trailer, which is covered under Demolition Burial of <br />Concrete Waste, and removal of all mining equipment and scrap.($3000). Volume of topsoil <br />applied will be approximately 1500 tons per acre over approximately 44 acres of pit area <br />including roads. Topsoil materials wi[I be imported and will not entail the development of a <br />borrow area on Tezak property. <br />The $1500/acre estimate for highwall configuration covers the cost of drilling and 1>resplitting <br />the highwall area estimating 1000 feet of drilling per acre of exposed rock face, estimating drill <br />cost $0.55/foot drilled and blasting presplitting cost of $0.45/foot shot, $500/acre e~~timate for <br />bulldozer cost to prep drill and site and finish grade storm ditch grade to toe. <br />A 3.5% cost addition will be added to the overall Reclamation Cost Estimate Calculation for a <br />rounded off Cost estimate total of $219,600.00. <br />1 will be forwarding all documents mentioned above post haste as they are available:. I would <br />also like to review the methodology the Division would prefer to perform a safety frctor analysis <br />on the highwall plan as submitted. We are having compressive strength tests run ors granite <br />gneiss material at the present time. <br />Please do not hesitate to contact if you have any questions. This fax transmission will be <br />followed up by hard copy and placed in the file at the Fremont County Clerk and Recorder <br />office. <br />Very Truly Yours, <br />~,.. <br />~'~~ `~ ~ <br />Kenneth S. Klco <br />Consulting Geologist <br />Azurite, Inc. <br />Copy: Ed Tezak, Jr. <br />