Laserfiche WebLink
Mr. Joseph Dudash - 2 - 3uly 31, 2002 <br />10. Tlxere is .still one misspelling of "sprayed" on page 2.05-27 and no copy of revised page <br />2.05-26 was received by the Division. Please provide revised pages 2.05-26 and 2.05-27. <br />BRL- We have corrected the typo's and resubmitted the pages. <br />11. No further concerns. <br />12. ~l'o further concerns. <br />13. No further concerns. <br />14. No further concerns. <br />I5. No further concerns. <br />16. No further concerns. <br />17. No further concerns. <br />18. There does not appear to be apreviously-approved backfilling and grading reclamation <br />plan for the train loadout and highway coal stockpile areas. The Division believes that it <br />is not within the scope of this revision to review and approve a new backfilling and <br />grading plan. This issue will need to be resolved later in a separate revision. IfBRL <br />agrees, please remove Map 8, "Pre & Post Mining Topography", and Map 13, "Existing <br />and Post-mining Cross-Sections"from the TR-19 submittal. Also, please remove any <br />references to these two maps and this backfilling and grading plan in the i/olume IX <br />Table of Contents pages and text. <br />These maps and references have been removed and a new table of contents is included. <br />Please contact us with any questions or concerns regazding this submission with copies of <br />all written correspondence sent to Mr. Wm. A. Beaz, Jr., P. O. Box 483, Paonia, CO 81428. <br />Sincerely, <br />J. E. Stover, P. E. <br />Consulting Engineer <br />