My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91229
DRMS
>
Back File Migration
>
Revision
>
REV91229
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:48 AM
Creation date
11/21/2007 11:09:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977205
IBM Index Class Name
Revision
Doc Date
3/17/2000
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />CIRCES Cost Estimating Software <br />Agency or organization name <br />TaskA: n1a <br />Date : 0 3/142 0 0 0 <br />User: SSS <br /> <br />Permit or otherjob action <br />State :Colorado PermiUjob/t : M-77.205 <br />County :Delta Ahbrevialion :none <br />Site: Td County Gravel Filename:M205nfa <br />andment no. 1 <br />Task description : Regtade s Veam channel and hvo dikes /n north insVeam parcel <br /> <br />HOURLY EQUIPMENT COST Basic machine:CaI DBN (1996) Horsepower: 2B6 <br />Blade type :Angle <br />Attachment no. 1 : ROPS Cab Shifl basis : 1 per day <br />Anachment no. 2 : 3-shank ripper <br /> Util¢ation % Cost data source : (CRG) <br />Cost Breakdown : Ownership cost hour : $40.97 NA <br />Operating cosOhour: $55.48 100 <br />Ripper op. cosVhour : E0.00 0 <br />Operator cosUhour: 823.12 NA <br />Total unit cost/hour : E119.57 Total flee) cosOhour : 5119.57 <br />Initial Svrell <br />volume: 1,200 LCY factor <br />Source of quantity lake-ofl :Assume 1200' x <br />Loose <br />NA volume: 1,200 LCY <br />rank graded ~ .5 ac.8lac Plus 2-100 c.y. dikes <br />Source of est. swell lector : NA <br />HOURLY PRODUCTION <br />Average push distance : 55 feet <br />Unadjusted hourly producion : 1126 LCY/hr <br />Material consistenry description <br />ON. non-C0heah/6 <br />Average push gradient : 9.00 % <br />Average site altitude : 5,380 teal <br />Malarial weigh) : 3,250 Ibs/LCV <br />Material weigh) description <br />Gravel - P/tmn <br />JOB TIME AND COST <br />Fleet size : / Dozers) <br />Operator skill : 0.75 <br />Material consistency : 0.80 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Joh etgciancy : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 0.B7 <br />Altitude : 7.00 <br />Material weight : 0.71 <br />Blade type : 0.62 <br />Source <br />Net correction : 0.12 <br />Adjusted unit production : 140.68 LCY/hr <br />Adjusted Seel production : 140.88 LCY/hr <br />Total job time: 8.53 Hours <br />Unit cost : 80.850 /LCV Total job cost : 51,020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.