My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91229
DRMS
>
Back File Migration
>
Revision
>
REV91229
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:48 AM
Creation date
11/21/2007 11:09:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977205
IBM Index Class Name
Revision
Doc Date
3/17/2000
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />Task A <br />Dale <br />User <br />CIRCES Cost Estimating Software <br /> <br />Agency or organization name :OMG <br />s2a <br />03H42000 <br />SSS <br />State : Coloraob PermiUjob C : M-77-205 <br />County :Delta Abbreviation :none <br />Site: Tn CounN G2ve1 Filename:M20SS2a <br />Permit or other job action : Amendmen(No. 7 <br />task description :Rip facilities yard area and spread 2800 c.y. of fines topsoil <br />,:m .-_ <br />r~;ayt 3 <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 16G (1995) Horsepower : 275 <br />Anachmenl no. 1 : NA Shifl basis : 1 per day <br />Anachment no. 2 : Mulll-shank ripper <br />Utilization % Cosl data source : (CRGJ <br />Cost Breakdown Ovmership cosUhour : E45.25 NA <br />Operating cosUhour: S51.B7 100 <br />Ripper op.cosUhour: 52.06 50 <br />Operator cosUhour: 323.30 <br />NA <br />Total unit cosUhour : 5722.42 Total Oeel cosVhr : $122.42 <br />MATERIAL QUANTITIES <br />Total area to be graded : $.OO acres <br />Source of quantity take-oR: Assume 5 acn:s of yard aroa to ba ravegefafed <br />s; <br />HOURLY PRODUCTION <br />Selected grading aclivityNrork level :Medium gradingAippfng <br />Unadjusted hourly unit production : 0.79 acres/hr (Cal HB) <br />Job Condition Comecfion Factors <br />Average silo altitude : 5,380 feel <br />Altitude adjustment lector: 1.00 (Cat HB) <br />Job eRcienq adjustment lector : O.B3 (1 sh/Ntlay) <br /> <br />Net job correction : O.B3 <br />Adjusted hourly unit production : O.fi6 acresmr <br />Adjusted hourly gees production : 0.66 ecres/hr <br />JOB TIME AND COST <br />Fleet size : 1 Grader(s) Total job time : 7,63 Hours <br />Unit cast : 5186.77 /acre Total joh cost : $934 <br />.,~~ e -~. w,,: .t.~.l <br />
The URL can be used to link to this page
Your browser does not support the video tag.