Laserfiche WebLink
ROADABLE EQUIPMENT: <br />----^------------- To[al Eqp. Fleet Size Haul Trip Return Trip <br />Machine Description Cost/hr (no. hauled) CostJhr Cost{hr <br />12 - [8 yd dump truck E63.95 1 E63.95 E63.95 <br />Subtotals E63.95 E63.95 <br />MOB/DEMOB SUPPORT EQUIPMENT: --------- --------- <br />sheet 2 of 2 <br />--------------------------- Weigh[ Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permic <br />Non-Roadable Eqp. Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cast/hr Cost/ea <br />Subtotals E0.00 E0.00 E0.00 <br />Total Eqp. Fleet Size Haul Trip Return Trip <br />Roadable Eqp. Description Cost/hr (no. hauled) Cost7hr CostJhr <br />----------------------------------------------------------------------,------'----- ---------------- <br />Subtotals 50.00 E0.00 <br />EQUIPMENT NAUL DISTANCE & TIME <br />Nearest major city or town within project area region: Paonia <br />Total one way travel distance = 70.0 miles. Average travel speed = 45.00 mph. <br />Job Time - Non Roadable Equip.= 0.50 hours load Roadable Equip.= N/A hours load <br />0.22 hours haul 0.22 hours haul <br />0.50 hours unload N/A hours unload <br />0.22 hours return 0.22 hours return <br />JOB COST Total Nob/Demob Cost = E1,859.67 <br />NOTE: Non-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equi Anent on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially for equi Anent which must be <br />partially dismantled for transport and re-assembled at the job site. Costs for lifting equipment and other <br />support equipment needed for this work should be included in the mob/demob costs. <br />