My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91229
DRMS
>
Back File Migration
>
Revision
>
REV91229
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:48 AM
Creation date
11/21/2007 11:09:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977205
IBM Index Class Name
Revision
Doc Date
3/17/2000
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />Agenq or organization name :OMG <br />Task # : p2a State :Colorado PermiVOb# : M-77-205 <br />Data : 03/74.2000 County :Delta Abbreviation :none <br />User : SSS Site : Td County Gravel Filename : M205-p2a <br /> <br />Permi t or otherjoh action : amentlmenl no. 1 <br /> <br /> <br />. Task description ~. Replace topsoil on banks of Phase I and SVlpped area of Phase II <br />„~ <br />.. ,a.~.. <br />HOURLY EQUIPMENT COST Basic machine : Caf D8N (1996) Horsepower : 2B5 <br /> Blade type : Sem/-Un/versal <br /> Anachmenl no. 1 : ROPS Cab Shig hasis : 1 per day <br /> Attachment no. 2 : 3-shank upper <br /> <br /> Ulil¢alion 96 Cosl data source : (CRG) <br /> Cost Breakdown : Ownership cosOhour : 541.10 NA <br /> Operating casllhour : 555.64 100 <br /> Ripper op. cosVhour: 40.69 10 <br /> Operator costRlour: $23.12 NA <br /> Total unit cost hour: Sf20.55 Total Oeet cosOhour: 5120.55 <br /> <br />Initial Swell Loose <br />volume: 5,400 LCY factor: NA volume: 5,400 LCV <br />Source of quanliry lake-o8: 1600'x 45'bank 8 1100'x 200'sfdpped ante w/6.2placed <br />Source of est. swell lector : NA <br />HOURLY PRODUCTION <br />Job Condition Correction Faclars <br />Average push distance : 125 leet Scurce <br />Unadjusted hourry production : 686 LCY/hr <br />Material consistency description <br />Partly consolldafed stockpile <br /> <br />Average push gradient : 0.00 % (pos) <br /> <br />Average silo altitude : 5,380 feel <br />Material vxight : 2,100 Ibs/LCY <br />Material weight description <br />Earth -Loam <br />Operator skill: 0.75 (evg <br />Material consistency: 1.10 (Caf 1 <br />Dozing method : 1.00 (per <br />Vsi6ility: 1.00 (avy <br />Job eFiciency: 0.83 (ishiN <br />Spoil pile: 0.60 (Ind. <br />Push gmdient : 1.00 (Cat f <br />Altitude : 1.00 (Cat l <br />Material weight : 1.10 (Cell <br />Blade type : 0.62 (ang, <br /> <br />Net correction : 0.28 <br />Adjusted unit production : 192.84 LCY/hr <br />Adjusted Oeet production : 192.84 LDY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total jab time : 28.00 Hours <br />Unit cost : 30.625 /LCY Total job cost : 53,370 <br />+r~ zr.,;, .~ ~ i <br />
The URL can be used to link to this page
Your browser does not support the video tag.