Laserfiche WebLink
FPOf9 : FH:~: t10. 171`+E~-tG-1g;5 Hpr. 3_ 3Jt33 X32: -~~Pf9 PS <br />was dry in ?00~. surface run-off i; and has bcrn diverted through sediment conn'ul facilities limiting <br />lx,tential impacu io surface water. <br />A soils sampling prob am indicated contamnated wits were contained within a radius ofsi.CN leer from <br />the dispcnsina station aad a vertkal mne of no tnore than cigttteen Teet and did not rncountet any water <br />bearing zones. <br />Conclusions <br />Actionable Levels of TPH were detected and limited to an area itmnediatcly surrounding a diesel distxnsing <br />station. <br />The mine operator chose ro remediate the site by Iran>-porting the contaminated soils to a focal tendfill <br />petmi¢ed to accept TPH contaminated soils. Approximately X09 cubic yards were received by the facility. <br />lndividusl toads were not samolett Hawed nn in_cin, c,mplh.o. *r.z ~yc.~~ rov ~r--~; ~'~`c .-` -"_.. <br />soils was below actionable levels. <br />Sample results demonstrate that soils remaining on site an well below actionable levels, the area has bten <br />rrn~ediated and can be re-graded to the approved post-mining topo~ aphy. <br />Peak Project Management, U.C <br />34115 County Road 20.8, Trinidad. CO 81082 <br />Phonelfaz (719) 846-4975 a-mail: ronthompson(~sensonics.org <br />