Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID #: nn_reR~_rn~ <br />INSPECTION DATE: ~-o~-n~ INSPECTOR=S INITIALS; ~_ <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severitywhen considered <br />by the Mined land Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. The site has not been totally reclaimed pursuant to requirements of the approved FutGre / <br />reclamation plan so the request for release has been denied. <br />2. <br />PB or PV: ~B_ <br />TOPIC(S): ~~L <br />RS <br />/ / <br />PBOrPV; _ <br />TOPIC(S): <br />3. / / <br />PB or PV: <br />TOPIC(S): <br />