Laserfiche WebLink
• <br />iii iiiiiiiiiiiii iii <br />STATE OF COLORP~DO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />731 3 Sherman SL. Room 215 <br />Demcr, Colorado 80203 <br />Phone: 13031 86G-3567 <br />FA%~ (3031 832-8106 <br />September 10, 1998 <br />James Cooper <br />Picketwire Processing, LLC <br />?949 South Biscay Street <br />Aurora, CO 80013 <br />Re: New Elk Nline (Permit No. C-S1-012) <br />Proposed Decision -Technical Revision No. 41 <br />Mid-Term Review Responses <br />Dear Mr. Cooper: <br />~~~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Rov Romer <br />Governor <br />lames 5. Lochhead <br />Execmrve Director <br />Michael 8. Long <br />Dinsion Director <br />Enclosed you will find the Division of Minerals and Geology's Proposed Decision for Technical Revision <br />No. 41 at the New Elk Mine. Notice of the proposed decision will be published in the Chronicle -News <br />as soon as possible. The first publication will initiate the ten (10) day public comment period for the <br />Division's decision. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of <br />Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the <br />Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond that <br />equals or exceeds the Revised Liability. The revision will not be final until the bond is approved by the <br />Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />~~ ~~~~ <br />Kent A. Gorham <br />Environmental Protection Specialist <br />KAG/JRC <br />Enclosure <br />cc: Jerry Koblitz, Greystone <br />hl:\OSSURC~TEMPCI'RO801: K.4G <br />