Laserfiche WebLink
• <br />• <br />-3- <br /> Permitted Actual Proposed <br />8. Mineral ownership: <br />(indicate currently <br />permitted acre for each) <br />Federal: 0 ac., <br />~ ac., <br />State: 140 140 140 <br />_ <br />Private: ac., 514 514 514 <br />Indian: 0 ac. <br />9. Surface Ownership: <br />(indicate currently <br />permitted acreage for <br />each) <br />Federal: 0 ac., <br />State: ac., 140 140 140 <br />Private: _ ac., 1358.31 1358.31 1358.31 <br />Indian: p ac. <br />10. Affected area (in acres) 424 424 424 <br />11. Disturbed area (in acres) 424 424 424 <br />12. Acreage of area reclaimed <br /> <br />ii previous permit term , <br />a) backfilled and graded n/a gg n/a <br />b) retopsoiled n/a 133 n/a <br />c) reseeded n/a 133 n/a <br />13. Acreage for which bond <br />has been released <br />a) 60 percent n/a 0 n/a <br />b) 85 percent n/a 0 n/a <br />c) 100 percent n/a 0 n/a <br />14. Renewal Term Requested <br />(Years) n/a n/a 5 yrs <br />Note: If the application contains proposed (new) acreage, then a permit <br />revision application form must also be completed for those acrea <br />15. Type of Mine (check one): Underground, XX Surface, _ <br />Combined Surface and underground, Load-0~; Other <br />16. Current Permit Status (check one): Active, Temporary Cessation, <br />X Permanent Cessation (reclamation only), ~iispended <br />i7. Current Estimated Life of Mine 1n years: 0 <br />• <br />