My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV90997
DRMS
>
Back File Migration
>
Revision
>
REV90997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:37 AM
Creation date
11/21/2007 11:08:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
3/10/1992
Doc Name
TR 12 INCIDENTAL BOUNDARY CHANGES SOUTHFIELD MINE C-81-014
From
MLRD
To
ENERGY FUELS COAL INC
Type & Sequence
TR12
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Allen Weaver - 2 - March 10, 1992 <br />5) It has Come to the Division's attention in the last two months that <br />culverts 39 and 40 and the northern-most extension of the refuse access <br />road ditch are also outside of the permit area. The primary solution to <br />this topic, as has been discussed, has been to run the permit boundary <br />from the east corner of the Pond 5 embankment outs lope west to the <br />north-south permit boundary line. Cathy Begej talked with Dave Bucknam, <br />Supervisor of the Inactive Mines Program, and confirmed that there would <br />be no special considerations from permitting lands reclaimed by the IMP. <br />As long as EFCI does not disturb this reclaimed area, there will be no <br />subsequent reclamation obligations. Right-of-entry documentation will be <br />required. <br />6) Abatement 4 of N.O.V. 91-37 required documentation of bonding costs <br />associated with removal of Ponds 1,Z,5 and loadout Ponds i and 2. The <br />submittal suggests that reclamation costs for these ponds are covered <br />under backfilling and grading estimates found in Exhibit Z0. Page <br />2.05.4-5 acknowledges that sediment pond removal will occur at some time <br />following the main reclamation activities at the site. The Division, <br />however, needs to specifically know how much material.is in each pond <br />embankment, as well as whether any material is required to be stockpiled <br />to fill the pond depressions to achieve A.O.C. Mobilization at a later <br />date must also be incorporated Into the bonding calcuiations. <br />The Division deadline for a decision on this revision is April 23, 1992. <br />Please get the adequacy responses to the Division by April 13, 1992, to <br />provide adequate time for Division review. <br />Sincerely, <br />l t'i~'l.~il/r LL ~'C.J <br />Catherine W. Begej <br />Reclamation Specialist <br />CWB/sj <br />cc: N.O.V. C-91-37 <br />1845E <br />
The URL can be used to link to this page
Your browser does not support the video tag.