Laserfiche WebLink
<br />1 <br />1 <br />1 <br />EXHIBIT D (Cont'd) <br />amounts of water in the sand and gravel during the period when the <br />fields on the upper part of the ranch are being irrigated. There <br />will be no discharge to the river by the mining or processing <br />operations. No NPDES permit will be required. See Exhibit G for <br />details. <br />liining Timetable. The mining stages listed below may be <br /> <br />correlated to ma p Exhibit D-1. The stages correspond to the <br />reclamation phas es i n Exhibits E and F and are numbered accordingly. <br />Note that t hese are estimates only and that times may vary radi- <br />cally depen ding on market, weather and the general economy. <br /> Total <br /> Mined Mined Acr es <br />Stage Years Acres On Slope Total Acres <br /> <br />I 9 to 15 17.68 2.37 18.11 <br />II 3 to 5 5.57 -0- 5.57 <br />III 3 to 5 4.87 -0- 4.87 <br />IV 3 to 5 6.48 3.38 6.90 <br />V 3 to 5 6.22 -0- 6.22 <br />VI 3 to 5 7.07 -0- 7.07 <br />VII 3 to 5 6.49 -0- 6.49 <br />VIII 3 to 5 5.43 -0- 5.71 <br />IX 3 to 5 5.49 -0- 5.66 <br />X 3 to 5 6.09 1.40 6.09 <br />XI 3 to 5 5.57 1.38 5.57 <br />XII 3 to 5 5.70 2.07 5.70 <br />XIII 3 to 5 6.85 4.77 6.85 <br />XIV 3 to 5 6.13 3.32 6.13 <br />XV 3 to 5 6.53 -0- 6.53 <br />XVI 3 to 5 10.03 -0- 10.03 <br />XVII 0.5 to 1.5 3.45 -0- 3.45 <br />P 57 to 96 5.66 2.29 6.00 <br />Totals 121.31 20.98 122.95 <br />- 12 - <br />