My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV90951
DRMS
>
Back File Migration
>
Revision
>
REV90951
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:35 AM
Creation date
11/21/2007 11:08:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
7/18/2007
Doc Name
Adequacy Response Letter
From
Twentymile Coal Company
To
DRMS
Type & Sequence
MR217
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peabody <br />Twentymile Coal <br />July 16, 2007 <br />Byron G. Walker <br />Colorado Division of Reclamation, Mining, and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />(303)866-4941 <br />///~2,c%~~s~, <br />~:~'///>/il/S'G/(/ <br />29515 Routt County Road 27 <br />Oak Creek, CO 80467 <br />970.879.3800 <br />R~~~~ V LD <br />JUL 18 2007 <br />Division ~f Reclamation, <br />Mining and Safety <br />Re: Twentymile Coal Company - Foidel Creek Mine (C-82-056), Minor Revision MR07-217 - <br />Warehouse Expansion Technical Adequacy Responses <br />Dear Mr. Walker: <br />In response to your 07/11/07 Technical Adequacy letter outlining minor text and map edits necessary <br />to meet Technical Adequacy requirements for the above-referenced Minor Revision; the following <br />respond to your comments: <br />Item 1) -Please correct the lack of continuity from the revised page 2.05-18 of 06/27/07 (MR07-217) <br />and the unchanged page 2.05-17.3 of 11/27/06 (PR06-07). A portion of the bathhouse description was <br />omitted. <br />Resaonse: The referenced text pages have been reviewed and revised to provide for text continuity. <br />Copies of the revised pages accompany these responses. <br />Item 2) -Map 24, Sheet 1 of 3, 07/03/07 (MR 217) shows the proposed thickener underflow lines of <br />TR-60. TR-60 has not been permitted. Please remove un permitted features. Or, request a stay of a <br />decision on this minor revision until this drawing is applicable (note that the desirable label on the <br />thickener underflow lines was removed). <br />Response: Map 24, Sheet 1 of 3 has been revised to eliminate the thickener underflow components, <br />for which approvals are pending. Copies of the revised map have already been submitted under <br />separate cover. <br />Item 3) -Map 24, Sheet 1 of 3, 07/03/07 (MR 217) lacks the certification signature of a registered <br />engineer. Please submit a certified copy of the map. <br />Resaonse: The revised copies of Map 24, Sheet 1 of 3, referenced in the response to Item 2 and <br />submitted under separate cover, include the required certification. <br />Item 4) -The application included a reclamation cost estimate of $14,450. The Division of <br />Reclamation, Mining and Safety (Division) estimate for the reclamation work is $22,937. A copy of the <br />Division estimate is attached (Pages A-133.1 and A-133.2). The major discrepancy is in the cost of <br />floor demolition. Please let us know if you wish to accept the Division estimate in the application. <br />Please contact Janet Binns (303-866-3944) of the Division if you wish to discuss the estimate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.