My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV90916
DRMS
>
Back File Migration
>
Revision
>
REV90916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:33 AM
Creation date
11/21/2007 11:07:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
4/8/1994
Doc Name
MR 119 WEST ELK MINE PN C-80-007
From
DMG
To
MOUNTAIN COAL CO
Type & Sequence
MR119
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-~~ iii iuiiiiiiiiuiii~ <br />STATE OF COLURAD0 <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Rewurces <br />1313 Sherman St., Roam 215 <br />Denver, Colorado 80203 <br />Phone: 13031 866-7 56 7 <br />FA%:13031832-8106 <br />April 8, 1994 <br />Mr. Henry Barbe <br />Mountain Coal Company <br />P.O. Box 591 <br />Somerset, CO 81434 <br />I~~~~ <br />DHPARTMENT Of <br />NATURAL <br />RESOURCE <br />Roy Romer <br />Governor <br />Krn Salazar <br />E~ecmne Dueaur <br />hGChael B. Long; <br />Divoion Drreclor <br />RE: Minor Revision No. 119; West Elk Mine; Permit No. C-80-007 <br />Dear Mr. Barbe; <br />The Division has reviewed and proposes to approve Mountain Coal <br />Company's (MCC) application for a minor revision which extends <br />ditch D1-5B at the explosives magazine bench. <br />MCC states in the application that the ditch will be sized for 0.1 <br />cubic feet per second (cfs). This is acceptable as the upstream <br />culvert, C1-7, is designed for 0.02 cfs. The ditch designs and Map <br />53 were not provided with this revision; however, other ditches and <br />culverts and Map 53 have been required to be updated in the mid- <br />term review, so MCC should include this ditch in the revision of <br />those items. This ditch has been inspected in the field by the <br />Division, and it appears to be adequately sized. This ditch should <br />ensure that water gets to the sediment ponds as quick as possible, <br />to avoid any potential slope instability problems. <br />Please call if you have any questions. <br />Sincerely, <br />Christine E. Jotton <br />Environmental P o ection Specialist <br />CEJ/007MR119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.