Laserfiche WebLink
In addition to mining and topsoil stripping changes, Trapper is submitting an updated <br />Map M12 (Post-Mining Topography), Sheets 2 and 3. The revised maps show minor <br />updates in F and Z Pits as well as the projected post-mining configuration for the current <br />ash disposal site. <br />Reclamation liability additions associated with this revision ($94,244.68) aze shown on <br />the attached calculation sheet. This sheet will be added to Appendix A. (Note that no <br />additional lineal feet of pit were added as a result of this revision, thus no additional pit <br />backfilling costs). <br />This revision is intended to provide the permitted azea needed to operate during the PR-6 <br />approval process. PR-6 will be submitted by October 31S'' 2007 and will include a <br />comprehensive look at the 2008-2012 mine plan and associated reclamation <br />requirements. <br />Please contact me or Jim Mattem if you have any questions regazding the enclosed <br />information. <br />Sincerely, <br />_' / / ll <br />Forrest V. Luke <br />Environmental Manager <br />FVL [M/Pernut Revisions/'TR101 Cover Letter.doc] <br />c Janet Binns-two copies w/ attachments <br />John Husband, BLM w/ attachments <br />File 109.2.3.4 w/o attachments <br />Revisions File <br />