Laserfiche WebLink
CIRCES Cost EstimatinoSottware <br />DEMOLRION WORK <br />PROJECT IDENTIFlCATION Agency or organization name :OMG <br />iaskk: 14a State: Cprorado PermiVpbk: M4977-342 <br />Date: 11~1un-2002 County: Grantl Abbreviation :none <br />User: ESC Site: Henderson Mine Filename: M342-1aa <br />Permitting action :Reevaluate amount of required bond <br />Task description :Demolish Pawedines <br />UNIT COSTS Wst unit cost update: January, 2001 Location adjustment: &900% <br />STgUCTURE ar REM DESCRIPTION DtMENSIP,NS DEMOLITION MENU SELECTION OUAYTITY UNIT UNIT COST TOTAL COST <br />-Main Ute Park PS line <br />-Wes(fork PS Spur <br />East Fork PS Spur 12,320 h. <br />3.180 JI <br />1.2]0 h. Power/phone line-single pole <br />Powe /phoneline-single pole <br />Power/phone line -single pole 12,320.00 <br />3,180.00 <br />1.2]0.00 LF <br />LF <br />LF $2.0600 <br />520600 <br />32.0600 525,3]9.20 <br />36,550.80 <br />52.61620 <br />-Gavel Pi)Spm 600 h. Powedphone line-single pole 60000 LF 52.0600 51,23600 <br />-Pond Shop Spur 224011. Power/phone line -single pole 2,240.00 LF 32.0600 54.614 40 <br />~pt Dam Lighting 13.340 k. Power/phone Vine-single pole 13,340.00 LF 32.0600 52Z43g.40 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Joe cosy royal (aal. for mcauon) : 560,411 Total Cost (unadjusted) : 56],8]] <br />