Laserfiche WebLink
Page 1 of 1 <br />Dudash,Joe <br />From: Jim Stover [jestover@bresnan.net] <br />Sent: Monday, September 20, 2004 9;01 AM <br />To: Joe Dudash <br />Subject: Bowie-2 <br />Joe: <br />Two items: <br />1. BRL still plans to construct a rock protection berm for the Miley residence. Based on our prior discussions, it is <br />my understanding the work can be performed without DMG oversight. <br />2. Regarding subsidence, BRL is only obligated to survey those monuments listed in section 2.06.6(6), page <br />2.05-112. Monitoring of the seven subsidence monuments to measure settlement over superimposed multi-seam <br />extraction would be initiated before mining occurred in the B-Seam below or near each monument. <br />Jim Stover <br />3/14/2005 <br />