Laserfiche WebLink
<br />Condition No 2 - stormwater Manazement <br />DMG will require that the operator submit within 45 days an application fcr a technical <br />revision which provides appropriate stormwater runoff calculations, engineerin;designs and <br />plans, as well as all necessary approvals far the conveyance of stormwater from the <br />Tezak Quarry across Tunnel Drive [o the Arkansas River without causing adverse offsite <br />impacts. The revision application must also ensure that all designed structures will be <br />installed and functioning properly no later than March 30, 1996. The revision application <br />must include written approvals from the city of Canon City, the Hydraulic Ditrh Company, <br />and the Southern Pacific Railroad. <br />Condition No. 3 <br />The Division will require the operator to notice the objectors and all appropri~~te parties for <br />each revision to the amended permit and also provide a copy of each revision application for <br />review at the County Clerk and Recorders office in Canon City. <br />Condition No. 4 <br />The Division will require the operator to Cease and Desist from any disturoance in the <br />amendment area until the operator has successfully demonstrated compliance wi th conditions <br />1, 2, and 3, has received Division approval of an acceptable plan for s.tfely routing <br />stormwater offsite to the Arkansas River, and has completed installation of all approved <br />stormwater designs, including ditches, ponds, spillways, culverts, and other structures as <br />necessary. <br />Persons concerned with judicial review of the provisions of this Order are advised to consult C.R.S. 24~-106, <br />as amended. <br />~~ ; ~~ <br />Dated at Denver this ~~ day of ~ ;~i <br />COLORADO MINED LAND RECLAMATION BOARD <br />DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. LON C vector <br />Division of Minerals and eology <br />ANOSSWnmVelatla <br />