Laserfiche WebLink
• Colorado Division of Minarets and Geol o~ <br />ESTIMATING FORM - OULL002ER IARK ---- <br />Task N: 1 Prep, by: JD <br />Dste: - 12/22/94 Pensit N:M7809fUG <br />Permit Action: Final Reel aabtion <br />Task Descr iptian: Lower Portal Closure <br />Task File Naioe: M1UG-1 <br />Mine; Golden Nonder Mine <br />HOURLY EQUIPMENT COST <br />___:______________:_= Basic Machine: Cet D7G Horsepower: 200 <br /> Blade Type: Straight ---------- <br /> Attachment N1: ROPS Ceb Shift Bes is: 1/day <br /> Attachaa:nt N2: N/A ---------- <br />Cost Breakdown: <br />----------- Utilixetian X (code 050) <br />Owership Lost/hr f32.57 N/A <br />Operating i overhwl cost/hr- dozer 528.57 i00 <br /> -ripper f0.00 N/A <br />Operator cost/hr 521.58 N/A <br />Total eopt, unit cost/hr = f82.72 Total f leet cost/h r: f82.72 <br />' MATERIAL QUANTITIES <br />____:_ _::==:sz===: <br />I ni Ciel Swell Loose <br />Volume: 2,725.0 CCY Factor: 1.125 Volume; 3,065.6 LCY <br />Source of quantity take-off: Calculation <br />Source of est. swell factor: Prograa <br />HOURLY PROOUCTI ON <br />____:_:__:_~ .:_= Job Condition Correc tion Factors <br />Avg. push distance: 300 ft. -------------------- ------------ <br />_ -___--__ Operator.......... 0.75 (avg.) <br />Unedj us tad hourly Mat. cons istercy.. 1.10 (Cat tbl) <br />dozer production: 171 LCY/hr Dozing method..... 1.00 (gen.) <br />- -------- Visibility........ 1.00 (avg.) <br />Materiel consistency: Job efficiency.... 0.83 (1sh/day) <br />ParCly co~olidated s tockpile Trensmiss ian type. 1.00 ( PS ) <br />------------------- ---------------- Grade adjustment.. 0.71 (Cat tbl) <br />Avg. push gradient: 13.00 X (pos) Altitude adj. .... 0.92 (Cat tbl) <br />- ----- Material weight... 1.00 iCat tbl) <br />Avg. site altitude: 9800 ft. Blade type........ 1.00 (S or U) <br />Materiel weight 2300.00 lb/LCY Me[ Job Correction 0.45 <br />Met. Descr.: - -------- ----^---- <br />GENERAL FILL Adjusted Unit Prod.: 76.81 LCYJhr <br /> Adjusted Fleet Production: 7b.81 LCY/hr <br />JOB COST ----------' <br />z===s== <br />Fleet size 1 Dozers) Total Job Time: 39.91 Hours <br />Unit Cost (7.077 /LCY Total Job CosC: 53,301.32 <br />